- Design stage – One-stage. Adjustment of project documentation in the stage of Working Project;
- Length – 2.5 km;
- Road category – I-б;
- Object belongs to the CC3 consequence class;
- Complex topographic-geodesic, engineering-geological, archeological and technical-economic survey;
- Development of design solutions for the reconstruction of the bridge at km 358 + 823 with a length of 36.55 l.m., and the replacement of the bridge at km 361 + 084 with a length of 6.0 l.m., with a culvert box;
- Replacement of pipe culverts;
- Project expertise and obtention of a positive expert report.