- Design stage – One-stage. Design in the stage of Working Project;
- Section length – 12.4 km;
- Road category – ІІ;
- Object belongs to the CC3 consequence class;
- Engineering surveys: topographic-geodesic; engineering-geological;
- Installation of pipe culverts and bus stops;
- Arrangement of a platform for the location of dimensional and weight control point;
- Installation of road signs and road markings with high reflectivity;
- Installation of lighting at intersections, places with speed change lanes and in all places of concentration of road accidents;
- Project expertise and obtention of a positive expert report.
General achievements
Our company has successfully developed and implemented 40 projects .
The total length of highways . is 245 km, of which 9 km are city roads, 236 km are public roads of state and local importance.
The projects included engineering of roads - artificial structures (bridges, overpasses, overpasses), special structures and means designed to ensure safe and comfortable conditions for vehicles.
Projects
All projectsDevelopment of project documentation Overhaul repairs of the national road M-14 Odesa – Melitopol – Novoazovsk (to Taganrog City) on the section of km 400 + 892 – km 413 + 292
- Section length – 12.4 km;
- Road category – ІІ;
- Object belongs to the CC3 consequence class;
More about the project
Development of design and estimate documentation “Overhaul repairs of Sofiivska Street in Odesa City”. (DK 021:2015 – 45233000-9 “Construction, arrangement of the foundation and covering of highways, roads”)
- Length – 0.692 km;
- Object belongs to the CC3 consequence class;
More about the project
Reconstruction of the public national road M-04 Znamianka – Luhansk – Izvaryne (to Volgograd City through Dnipro and Donetsk cities) on the section of km 292 + 174 – km 295 + 674, Dnipropetrovsk Region
- Length – 3.5 km;
- Road category – I-б;
- Object belongs to the CC3 consequence class;
More about the project
Projects on the map of Ukraine