- Design stage – One-stage. Adjustment of project documentation in the stage of Working Project;
- Length – 3.5 km;
- Road category – I-б;
- Object belongs to the CC3 consequence class;
- Complex topographic-geodesic, engineering-geological, archeological and technical-economic survey;
- Development of options for the design of pavement, transport interchanges, artificial structures (pipe culvert);
- Preliminary approvals of design decisions with interested organizations;
- Project expertise and obtention of a positive expert report.