- Design stage – One-stage. Design in the stage of Working Project;
- Section length – 6.0 km;
- Road category – II;
- Object belongs to the CC3 consequence class;
- Traffic intensity 5860 cars/day;
- Engineering surveys: topographic-geodesic; engineering-geological;
- Arrangement of junctions (9 un.) and bus stops (4 un.)
- Organization of lighting in Osypenko Village
- Project expertise and obtention of a positive expert report.