• Design stage – One-stage. Design in the stage of Working Project;
  • Section length – 11.74 km;
  • Road category – II;
  • Object belongs to the CC3 consequence class;
  • Traffic intensity 4620 cars/day;
  • Engineering surveys: topographic-geodesic; engineering-geological;
  • Development of design solutions for overhaul repairs of the bridge at km 462 + 190, 12.0 m in length;
  • Arrangement of a roundabout;
  • Replacement of pipe culverts in the number of 4 un./l.m.;
  • Arrangement of bus stops – 2 un.;
  • Arrangement of junctions – 22 un.;
  • Development of design solutions for lighting in Kostiantynivka Village and the roundabout.

See also