• design was performed in one stage – Working project.
  • Length – 7.35 km;
  • Road category – IV;
  • Consequence class – СС2;
  • Complex topographic-geodesic; engineering-geological survey.
  • Replacement of pipe culverts (6 un.);
  • Development and approval of pavement design with the Customer;
  • Project expertise carried out and expert report obtained.