• Design stage – One-stage. The design was performed in the stage – working design (RP).
  • Road category – III
  • The length of the site is 11.3 km
  • Topographic and geodetic surveys, engineering and hydrometric surveys were performed
  • bridges and overpasses – 1 pc. / 20,02пог.м.
  • Pipes – 5 pieces / 92.45 running meters.
  • A set of measures is provided, the composition of the necessary infrastructure to ensure the efficient operation of the repair facility
  • Provision of the use of advanced technologies, new materials, binders modified with polymers and surfactants, road fences made of metal tape and lighting poles with effective corrosion protection, etc. The arrangement of horizontal road markings should be made of modern wear-resistant materials.