• Design stage – One-stage. The design was performed in the stage – working design (RP).
  • The length of the site is 36.6 km
  • Road category – II and III
  • bridges and overpasses – 5 pieces / 952.08 running meters
  • pipes – 24 pcs
  • A set of measures is provided, the composition of the necessary infrastructure to ensure the efficient operation of the pair facility
  • Protection of buildings from corrosion and stability of the base of pavement are provided
  • Advanced technologies and materials are used