- Design stage – One-stage. The design was performed in the stage – working design (RP).
- The length of the site is 36.6 km
- Road category – II and III
- bridges and overpasses – 5 pieces / 952.08 running meters
- pipes – 24 pcs
- A set of measures is provided, the composition of the necessary infrastructure to ensure the efficient operation of the pair facility
- Protection of buildings from corrosion and stability of the base of pavement are provided
- Advanced technologies and materials are used