- Design stage – One-stage. Design in the stage of Working Project;
- Section length – 12.4 km;
- Road category – ІІ;
- Object belongs to the CC3 consequence class;
- Engineering surveys: topographic-geodesic; engineering-geological;
- Installation of pipe culverts and bus stops;
- Arrangement of a platform for the location of dimensional and weight control point;
- Installation of road signs and road markings with high reflectivity;
- Installation of lighting at intersections, places with speed change lanes and in all places of concentration of road accidents;
- Project expertise and obtention of a positive expert report.