• Design stage – One-stage. Design in the stage of Working Project;
  • Section length – 35.123 km;
  • Road category – II;
  • Object belongs to the CC3 consequence class;
  • Traffic intensity 5860 cars/day;
  • Engineering surveys: topographic-geodesic; engineering-geological;
  • Development of design solutions for overhaul repairs of the bridges at:

 – km 473+414, 12.01 m in length;

 – at km 475+089, 18.4 m in length;

 – at km 492+299, 60.7 m in length;

  • Replacement of pipe culverts in the number of – 14 un./l.m.;
  • Arrangement of bus stops and junctions;
  • Development of design solutions for lighting of Novoivanivka Village, Pryazovske Urban-Type Settlement, Volodymyrivka Village;
  • Arrangement of a platform for the location of dimensional and weight control point;
  • Arrangement of a recreation area;
  • Provision of warnings for drivers of the need to reduce speed on the approaches to pedestrian crossings in one level (warning signs, road markings, noise bands, lighting);
  • Installation of sidewalks and pedestrian paths with lowered street curb, tactile paving slabs and other means for people with impaired mobility in settlements and dwellings zone;
  • Provision of appropriate access to public transport stops;

See also