• Design stage – One-stage. Design in the stage of Working Project;
  • Section length – 6.0 km;
  • Road category – II;
  • Object belongs to the CC3 consequence class;
  • Traffic intensity 5860 cars/day;
  • Engineering surveys: topographic-geodesic; engineering-geological;
  • Arrangement of junctions (9 un.) and bus stops (4 un.)
  • Organization of lighting in Osypenko Village
  • Project expertise and obtention of a positive expert report.

See also