• Design stage – One-stage. Design in the stage of Working Project;
  • Section length – 5.647 km;
  • Road category – II;
  • Object belongs to the CC3 consequence class;
  • Traffic intensity 5860 cars/day;
  • Engineering surveys: topographic-geodesic; engineering-geological;
  • Development of design solutions for overhaul repairs of the bridge at km 578 + 431, 90.7 m in length and arrangement of the roundabout at km 575 + 500 and junctions;
  • Organization of lighting in Chervone Pole Village;
  • Arrangement of a platform for the location of dimensional and weight control point;
  • Project expertise and obtention of a positive expert report.

See also