• Design stage – One-stage. Adjustment of project documentation in the stage of Working Project;
  • Length – 3.5 km;
  • Road category – I-б;
  • Object belongs to the CC3 consequence class;
  • Complex topographic-geodesic, engineering-geological, archeological and technical-economic survey;
  • Development of options for the design of pavement, transport interchanges, artificial structures (pipe culvert);
  • Preliminary approvals of design decisions with interested organizations;
  • Project expertise and obtention of a positive expert report.

See also