• Design stage – One-stage. Adjustment of project documentation in the stage of Working Project;
  • Length – 2.5 km;
  • Road category – I-б;
  • Object belongs to the CC3 consequence class;
  • Complex topographic-geodesic, engineering-geological, archeological and technical-economic survey;
  • Development of design solutions for the reconstruction of the bridge at km 358 + 823 with a length of 36.55 l.m., and the replacement of the bridge at km 361 + 084 with a length of 6.0 l.m., with a culvert box;
  • Replacement of pipe culverts;
  • Project expertise and obtention of a positive expert report.