- Design stage – One-stage. Adjustment of project documentation in the stage of Working Project;
- Length – 0.692 km;
- Object belongs to the CC3 consequence class;
- Development of design solutions for:
overhaul repairs of the roadway and sidewalks made of asphalt concrete; tram track and contact line; outdoor lighting; gas supply networks; water supply and sewerage networks; power supply networks;
- Development of sections: “Landscaping” and “Road traffic organization”;
- Storm water discharge;
- Project expertise and obtention of a positive expert report.