• Design stage – One-stage. Adjustment of project documentation in the stage of Working Project;
  • Length – 0.692 km;
  • Object belongs to the CC3 consequence class;
  • Development of design solutions for:

overhaul repairs of the roadway and sidewalks made of asphalt concrete; tram track and contact line; outdoor lighting; gas supply networks; water supply and sewerage networks; power supply networks;

  • Development of sections: “Landscaping” and “Road traffic organization”;
  • Storm water discharge;
  • Project expertise and obtention of a positive expert report.

See also